A factory new to EMS does not need to install everything at once. Start from the questions executives need answered, survey what already exists, then work in phases so the first phase shows results before deciding to expand.
01
Before starting: set questions and survey what exists
Clear questions make the number of measurement points and the budget more accurate.
Set questions
For example: which building uses the most, what causes the peak, how much do the cold rooms use each month
Survey what exists
Electrical single-line diagram, existing meters with models and communication ports, network and current servers
02
First phase: get the monitoring data in place
Connect the measurement points that answer key questions, build a baseline, and let the responsible people start using reports and alerts.
Connect measurement points
Use existing meters that can connect, add points only where needed, and choose wired or wireless links to suit the site
Build a baseline
Collect data for a period to see usage patterns before deciding on measures or expansion
03
Expand after the first phase proves useful
Add what is needed on the same platform, assessing the work and cost of each part separately.
Energy management
Add measurement points, targets and tracking of measures
Extensions
Data for CFO and ISO 50001, solar monitoring or machine vibration monitoring
Frequently asked questions
Must all existing meters be replaced?
Not always. Check the model and communication of existing meters first to see whether they can connect.
Does buying an EMS give ISO 50001 certification?
No. The system helps keep evidence and track work. Certification requires an assessment against the standard.
Try the system
Try the demo before starting a project
See the screens the factory team will use, then talk with DigitechX about measurement points for your factory
The demo uses simulated data
Click to open the demo
You have read all 5 parts
Let DigitechX assess value from your factory's electricity bills
Send past bills and the factory layout. The team will prepare an estimate and state the assumptions used.
Contact DigitechX →Further reading: Factory power meters: choose measurement points before installationISO 50001 explained