How to start an EMS: five steps from surveying measurement points to daily use and expansion

Start from the questions executives need answered, then define meters, systems and phases
November 5, 2026 by
How to start an EMS: five steps from surveying measurement points to daily use and expansion
DIGITECHX CO.,LTD.

A factory new to EMS does not need to install everything at once. Start from the questions executives need answered, survey what already exists, then work in phases so the first phase shows results before deciding to expand.

01

Before starting: set questions and survey what exists

Clear questions make the number of measurement points and the budget more accurate.

Set questions

For example: which building uses the most, what causes the peak, how much do the cold rooms use each month

Survey what exists

Electrical single-line diagram, existing meters with models and communication ports, network and current servers

Before startingPhase one: monitoringNext phase1Set questionsExecutives2Survey what existsFactory team + provider3Install phase oneProvider4Baseline and useFactory team5ExpandExecutives decide
Start in phases, and let the first phase show results before deciding to expand

02

First phase: get the monitoring data in place

Connect the measurement points that answer key questions, build a baseline, and let the responsible people start using reports and alerts.

Connect measurement points

Use existing meters that can connect, add points only where needed, and choose wired or wireless links to suit the site

Build a baseline

Collect data for a period to see usage patterns before deciding on measures or expansion

03

Expand after the first phase proves useful

Add what is needed on the same platform, assessing the work and cost of each part separately.

Energy management

Add measurement points, targets and tracking of measures

Extensions

Data for CFO and ISO 50001, solar monitoring or machine vibration monitoring

Frequently asked questions

Must all existing meters be replaced?

Not always. Check the model and communication of existing meters first to see whether they can connect.

Does buying an EMS give ISO 50001 certification?

No. The system helps keep evidence and track work. Certification requires an assessment against the standard.

Try the system

Try the demo before starting a project

See the screens the factory team will use, then talk with DigitechX about measurement points for your factory

The demo uses simulated data

EMS demo screenClick to open the demo

You have read all 5 parts

Let DigitechX assess value from your factory's electricity bills

Send past bills and the factory layout. The team will prepare an estimate and state the assumptions used.

Contact DigitechX →

Further reading: Factory power meters: choose measurement points before installationISO 50001 explained

References

  1. DOE 50001 Ready: Energy Data Collection and Analysis
  2. ISO: Energy management (ISO 50001)
  3. DigitechX Energy Management System

Information and sources reviewed: 6 November 2026